masthead image
Loading Main Menu...

Loading Left Navigation...
clear
search

clear clearCase Studies: Financial
clear
clear Through the links below, you can access R. W. Beck case studies for the Financial industry. Please contact us if you'd like more information on a particular case study. clear
 
 

Local Utility Provider Gets Introspective
A small regional utility located in rural Alabama retained R. W. Beck to perform a comprehensive performance review of operations and management as well as an initial valuation of its five utility systems.
 

Due Diligence Helps Bank Secure Investors
A large bank was considering investment in generation facility expansion and/or replacement at investor-owned utility sites scattered across the country and needed an asset evaluation before approaching investors.
 

Ushering in a New Era of Energy Production
A true industry pioneer, our client was interested in the possibility of financing the first ethanol production plant in Indonesia.
 

Long-Term Environmental Strategy Prepares for Future Configuration Conversion
A Louisiana electric utility needed a plan to address environmental permitting issues for bringing four 50-MW combustion turbines on line with the option of converting the units to combined-cycle configuration.
 

The Reality of Natural Gas Reserves Eases Litigation Burden
Our client was involved in land litigation and wished to assess natural gas value of the acreage in dispute.
 

Independent Study Enables Bank to Invest With Confidence
A large financial institution contracted R. W. Beck to conduct an independent engineering review, electric market analysis, fuel supply study and transmission study for a 250-MW combined-cycle power project in Mexico.
 

Innovative Procurement Strategy Saves Money, Satisfies Federal Requirements
Purchasing turbine generator sets on the secondary market resulted in significant savings while retaining the full manufactures warranty and support.
 

Independent Report Clears the Way for Electric Utility Transfer
A medium-sized Florida city gets assistance in planning the municipalization of the local electric distribution facilities.
 

Technical and Financial Reviews Set the Stage for Large Plant Expansion
A large multinational looking to double capacity at an ethylene plant contracted R. W. Beck to conduct an independent technical review of the project.
 

Ethanol Production Facilities Sprout in the Heartland
A private utility was planning to build three 100 million gallon/year corn-to-ethanol plants and required a thorough technical, financial and operational review for each.
 

System Analysis and Modeling Provides a Look 50 Years into the Future
Long-range forecasting details capital replacement costs based on existing asset condition assessment and expected useful lives.